Products
60227 IEC 01(BV) 0.45-0.75kV
60227 IEC 01(BV) 0.45-0.75kV
60227 IEC 01(BV) 0.45-0.75kV
Voltage: 0.6/1KV
Structure: Conducor Copper
Fire Resistance MICA
Insulation PVC
Jacket PVC
  • Overview
  • Specifications
  • FAQ
  • Test&Acceptance
  • Send Message

Scope of application

System

This product is suitable for AC 50Hz, voltage does not exceed 450/750V power line transmission power.

Occasion

Power plants, fixed wiring, household appliances, meters, lighting and telecommunication equipment with AC voltage of 450/750V and below.

Features

Good insulation performance, with a certain degree of acid and alkali resistance, oil resistance, moisture resistance; Stable structure, simple manufacturing process, low price.

Standards Compliant

Executive Standard

GB/T 5023-2008 PVC insulated cable with rated voltage 450/750V and below.

Usage features

Rated voltage

0.45/0.75 kV

Operating temperature

The maximum allowable long-term operating temperature of the conductor is 70℃.

Ambient Temperature

The ambient temperature of the cable should not be lower than 0℃.

Laying Temperature

The laying temperature of the cable should not be lower than 0℃.

Bending Radius

The allowable bending radius of a cable with an outer diameter (D) smaller than 25mm should be not less than 4D, and the allowable bending radius of a cable with an outer diameter (D) greater than 25mm should be not less than 6D.

Product Identification

Cores of Cable Wire

Blue

Sheath

1.The cable should have continuous identification of the manufacturer's name, product model and rated voltage, and the manufacturer's name identification can be repeated identification of the manufacturer or trademark;

2.The distance between the end of one complete sign and the beginning of the next sign shall not exceed 275mm; The printed logo should be erasable and not easy to fall off, and the printed content on the surface should be clearly recognizable.

Delivery and Tolerance

Delivery Length

The length of the circle should be 100m, and the length of the disk should be greater than 100m. Delivery of short segments not less than 10m in length shall be permitted, the number of which shall not exceed 10% of the total length of delivery, and the number of short segments in each piece shall not exceed 5, or delivery of cables of any length may be permitted by mutual agreement.

Length Error

Delivery length measurement error should not exceed ±0.5%.

Packaging, Transportation and Storage

Packaging

1.Coiled or coiled cables should be neatly wound and properly packed;

2.Cable tray shall comply with the provisions of JB/T 8137-1999; The cable end shall be sealed reliably, and the cable end extending out of the disk shall be covered with a protective cover, and the extension length shall be less than 300mm;

3.The cable package should be labeled with: manufacturer name, model, specification, rated voltage, length, quality, manufacturing date, standard number or certification mark, the correct rotation direction of the cable tray, etc.

Transportation

Transportation is generally in the form of vehicles and ships, and the cable must be firmly fixed during transportation to avoid damage to the cable or disc caused by bumping or tipping; The cable tray shall not be placed flat; It is strictly forbidden to drop the cable tray containing the cable from a height during transportation.

Storage

The finished cable should be stored in an environment with a temperature between 5 and 40 ℃ and humidity below 85%, so that it is not directly exposed to sunlight or rain, and should be properly ventilated to keep the environment dry.

Order Instructions

When ordering, the cable model, specification, length, packing method, delivery date and other necessary information should be correctly marked, such as:

Model: 60227 IEC 01(BV)

Specifications: 7 x 1.0

Length: 1000m

Packing method: pure wood plate packing

Delivery date: valid until ____

Mode of transport: train transport, car transport, ship transport or air transport Place of delivery: Buyer's warehouse or site or buyer's own delivery

Note: The mode of transport and place of delivery shall be specified by the Demander.

Installation Notice

During installation, the ambient temperature should not be lower than 0℃. If the ambient temperature measured by the thermometer is lower than 0℃, preheat the cable before preparing for installation. In high temperature environments without effective insulation measures, frequent sunlight or cold places, the corresponding special type of plastic wire should be selected.

No.of CORES CORSS SECTIONAL AREA
(MM2)
CONDUCTOR CORE DIAMETER
(MM2)
INSULATION THICKNESS
(MM)
OVERALL DIAMATER
(MM)
WEIGHT
(KG/KM)
DC RESISTANCE (OHM/KM)
1 1.5 1/1.38 1.38 0.7 2.9 20.9 12.1
1 2.5 1/1.78 1.78 0.8 3.5 32.8 7.41
1 4 1/2.25 2.25 0.8 4 47.9 4.61
1 6 1/2.76 2.76 0.8 4.5 67.8 3.08
1 10 7/1.35 4.05 1 6.3 116.3 1.83
1 16 7/1.66 4.98 1 7.1 167.1 1.15
1 25 7/2.14 6.42 1.2 9.1 268.8 0.727
1 35 7/2.52 7.56 1.2 10.2 364.6 0.524
1 50 19/1.78 8.9 1.4 12 517.7 0.387
1 70 19/2.14 10.7 1.4 13.8 708.2 0.268
1 95 19/2.52 12.6 1.6 16.1 959.7 0.193
1 120 37/2.03 14.21 1.6 17.7 1194.8 0.153
1 150 37/2.25 15.75 1.8 19.7 1493.4 0.124
1 185 37/2.52 17.64 2 22 1843.5 0.0991
1 240 61/2.25 20.25 2.2 25.1 2383.5 0.0754
1 300 61/2.52 22.68 2.4 28 2971.5 0.0601
1 400 61/2.85 25.65 2.6 31.4 3927.4 0.047
  • Who we are?

    We are based in Henan, China, start from 2012,sell to Domestic Market(70.00%), Mid East(11.00%), South America(10.00%), Africa(3.00%), North America(2.00%), Southeast Asia(2.00%), Eastern Asia(00.00%), South Asia(00.00%). There are total about 101-200 people in our office.

  • How can we guarantee quality?

    Always a pre-production sample before mass production; Always final Inspection before shipment.

  • What can you buy from us?

    Wire, Cable

  • Why should you buy from us not from other suppliers?

    We have twenty years of experience in design and development

  • What services can we provide?

    Accepted Delivery Terms: FOB,CFR,CIF,EXW;
    Accepted Payment Currency: USD,EUR;
    Accepted Payment Type: T/T,L/C,Money Gram,Western Union;
    Language Spoken: English,Chinese,French

  • How long does it take to get a quote back?

    Most quotes are returned within 24 hours

Test

Tests are divided into routine test, sample test and type test.

  • 01 Sample test

    Test items: conductor DC resistance, AC voltage withstand test, insulation thickness measurement, outer diameter measurement.

  • 02 Type test

    Test items: conductor DC resistance, AC voltage withstand test, insulation resistance, insulation thickness measurement, outer diameter measurement, aging test, weight loss test, high temperature pressure test, low temperature test, thermal shock test, non-delayed combustion test.

    Product performance requirements and test methods shall comply with the provisions of standard GB/T 5023-2008.

Acceptance Check

  • 01

    The purpose of the performance acceptance test is to check whether all the properties of the contract products meet the requirements.

  • 02

    The site of performance acceptance test shall be the demander's site.

  • 03

    The performance acceptance test shall be carried out within 6 months after the 168-hour full load trial operation of the product, and the specific test time shall be determined by both parties through negotiation.

  • 04

    Installation of measuring points, primary components and local instruments required for performance acceptance test shall be provided by the supplier and cooperated by the demander. The supplier shall also provide the technical cooperation and personnel cooperation required for the test.

  • 05

    Content of performance acceptance test. In accordance with supplier quality assurance and test requirements.

  • 06

    Criteria for performance acceptance test. In accordance with supplier's quality assurance and test requirements.

  • 07

    The performance acceptance test shall be conducted by the demander and participated by the supplier. The test program shall be provided by the demander and determined after discussion with the supplier. The specific test shall be completed by the testing department approved by both parties.

  • 08

    Confirmation of performance acceptance test results. The performance acceptance test report shall be prepared by the testing unit, and the conclusions of the report shall be accepted by both parties. If there is any disagreement between the two parties on the results of the test, the two parties shall settle it through negotiation. If no agreement can be reached, it shall be submitted to the superior departments of both parties for negotiation.

  • 09

    When a performance acceptance test is conducted, if a party fails to send personnel to participate in the test after receiving the test notice from the other party, it shall be deemed to have agreed to the acceptance test results.

Manufacture Supervision

  • 01 Supervision basis

    Refer to the former Ministry of Power Industry, Ministry of Machinery Industry issued by the electricity Office (1995) No. 37 "Interim Provisions for the quality supervision of large power equipment", "General representative group working Regulations in large power equipment manufacturers".

    Refer to DL/T 586-2008 Technical Guidelines for Equipment Supervision.

    GB/T 50319-2013 "Construction engineering supervision Code", GB/T 19000-2016/ISO 9000:2015 "Quality management and quality assurance" standard.

    The relevant commercial terms and technical agreements in the equipment purchase contract signed between the user and the manufacturer, including the documents, letters, correspondence and so on, which have legal effect.

    The product equipment drawing confirmed by the user and the manufacturer and the modification notice issued by the design unit.

    Technical documents and design drawings related to national standards, industry standards, enterprise standards (subject to the latest version). If the standards adopted by the technical documents and the design drawings are inconsistent with each other, the national standards, industry standards, and enterprise standards shall be adopted as the recurrence order.

    When the design drawing is inconsistent with the reference standard, the requirements in the standard shall prevail in principle, except for the special requirements of the parts.

  • 02 Supervision method

    Document witness, site witness and stoppage for inspection, namely R point, W point, H point.

    Each time after the completion of the supervision content, the supplier and the supervision representative will perform the signature procedure on the witness form. The supplier shall deliver one copy to the buyer's supervision representative.

    Point R: The supplier only needs to provide inspection or test records or reports of the item, that is, document witness.

    Point W: The inspection or test project attended by the representative of the buyer's supervision, that is, the on-site witness.

    H point: When the supplier stops to wait for the inspection or test of the buyer's supervision representative, that is, the project is stopped for inspection.

    Upon receipt of the witness notice, the Demander shall promptly send a representative to the site of the supplier's inspection or test to participate in on-site witness or stop work for inspection. If the representative of the Demander cannot attend on time, point W can be automatically converted to point R, but if point H is not agreed to be converted to point R by written notice of the Demander, the supplier will not transfer to the next process and agree with the Demander to change the witness time. If the buyer is still unable to participate on time after the change, the H point will be automatically converted to R point.

  • 03 Requirements for suppliers to cooperate with supervision

    3.1 The supplier shall have the obligation to cooperate with the demander's supervision and provide relevant information in a timely manner without incurring any costs.

    3.2 The Supplier shall provide the demander's supervision representative with the convenience of work and life.

    3.3 The supplier shall inform the Buyer's representative of the equipment supervision project and time before witnessing the site or stopping work for inspection.

    3.4 Demander's supervision representative has the right to check (borrow) the technical information related to the contract supervision equipment. If Demander considers it necessary to copy and file, the supplier shall provide convenience.

    3.5 The supplier shall provide the inspection and test records and reports to the supervision representative of the demander after the witness.

  • Please fill in your name

  • Please provide your phone number

  • Please fill in your email address

  • Please fill in your country

  • Please fill in your requirement information

  • Submit information

Home Tel Mail Inquiry