Products
Type G Mining Cable
Type G Mining Cable
Type G Mining Cable
Type G Mining Cable
Type G Mining Cable
Type G Mining Cable
Voltage: 2kV
Structure: Conductor Flexible stranded, soft drawn bare or tinned copper conductor per ASTM B172 Class I and ICEA S-75-381/NEMA WC 58
Insulation Ethylene-Propylene Rubber(EPR) per ICEA S-75-381/NEMA WC 58
Grounding Conductor Flexible stranded, soft drawn bare or tinned copper with green ethylene-propylene rubber (EPR) insulation
Jacket Black heavy duty thermoset CPE compound per ICEA S-75- 381/NEMA WC 58 that is ozone, sunlight, oil, grease, weather and chemical resistant
Color code Black, White, Red, Orange with Green Grounds
  • Overview
  • Specifications
  • FAQ
  • Test&Acceptance
  • Send Message

APPLICATION

Type G is for use in heavy-duty service as a power supply cable for mobile and portable mining equipment, loaders, conveyors, pumps, drills and cutters, and where flex life is required. Type G is for applications up to 2000 volts and temperatures from -40°C to +90°C.

CHARACTERISTICS

Voltage Rating Uo/U

2kV

Temperature Rating

-40°C to +90°C

STANDARDS

UL 44, 1581, 1650

C(UL) FT1 & FT5

CSA C22.2 No. 96

ICEA S-75-381/NEMA WC 58

ICEA S-95-658/NEMA WC 70

ASTM B33, B172

Oil Resistant, Sunlight Resistant 90°C Wet or Dry

Rated and flexible at –40ºC to +90°C

Sunlight Resistant

CONSTRUCTION

Conductor

Flexible stranded, soft drawn bare or tinned copper conductor per ASTM B172 Class I and ICEA S-75-381/NEMA WC 58

Separator

Tape separator between conductor and insulation

Insulation

Ethylene-Propylene Rubber(EPR) per ICEA S-75-381/NEMA WC 58

Grounding Conductor

Flexible stranded, soft drawn bare or tinned copper with green ethylene-propylene rubber (EPR) insulation

Assembly Tape

Single faced rubber filled binder tape applied over cable assembling

Jacket

Black heavy duty thermoset CPE compound per ICEA S-75- 381/NEMA WC 58 that is ozone, sunlight, oil, grease, weather and chemical resistant

Color code

Black White Red Orange with Green Grounds

Conductor Size No. of Conductors Conductor Stranding Ground Cond. Size Nominal Insulation Thickness Nominal Insulation Thickness Nominal Overall Diameter Nominal Overall Diameter Nominal Net Weight Ampacity** 30℃ in Air
AWG/kcmil AWG inches mm inches mm lbs/kft
8 4 133 4 # 12 0.060  1.52 0.980  24.89 679 52
6 4 259 4 # 12 0.060  1.52 1.100  27.94 890 70
4 4 259 4 # 10 0.060  1.52 1.220  30.99 1226 91
2 4 259 4 # 9 0.060  1.52 1.440  36.58 1782 122
1 4 259 4 # 8 0.080  2.03 1.590  40.39 2184 142
1/0 4 266 4 # 7 0.080  2.03 1.700  43.18 2611 164
2/0 4 242 4 # 6 0.080  2.03 1.850  46.99 3256 190
3/0 4 259 4 # 5 0.080  2.03 1.960  49.78 3778 219
4/0 4 532 4 # 4 0.080  2.03 2.150  54.61 4655 253
250 4 627 4 # 3 0.095  2.41 2.530  64.26 5844 282
350 4 888 4 # 1 0.095  2.41 2.830  71.88 7924 346
500 4 1221 4 # 1/0 0.095  2.41 3.400  86.36 10758 428
  • Who we are?

    We are based in Henan, China, start from 2012,sell to Domestic Market(70.00%), Mid East(11.00%), South America(10.00%), Africa(3.00%), North America(2.00%), Southeast Asia(2.00%), Eastern Asia(00.00%), South Asia(00.00%). There are total about 101-200 people in our office.

  • How can we guarantee quality?

    Always a pre-production sample before mass production; Always final Inspection before shipment.

  • What can you buy from us?

    Wire, Cable

  • Why should you buy from us not from other suppliers?

    We have twenty years of experience in design and development

  • What services can we provide?

    Accepted Delivery Terms: FOB,CFR,CIF,EXW;
    Accepted Payment Currency: USD,EUR;
    Accepted Payment Type: T/T,L/C,Money Gram,Western Union;
    Language Spoken: English,Chinese,French

  • How long does it take to get a quote back?

    Most quotes are returned within 24 hours

Test

1.sampling tests

Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;The sheathed average thickness and thinnest point

2.Type test items:

Sampling test items: cable conductor DC resistance; finished cable withstand voltage test;conductor single wire diameter and deviation;insulation average thickness, thinnest point;the sheathed average thickness and thinnest poin;change rate of tensile strength and elongation of insulation and sheath before and after aging;insulated wire core withstand voltage test;hot extension test;ozone resistance test;finished cable flexure test, etc.

Acceptance Check

The purpose of the performance acceptance test is to verify whether all the performance of the contract products meet the requirements

2.The location of the performance acceptance test is the purchaser’s site

3.The performance acceptance test shall be carried out within 6 months after the 168-hour full load trial operation of the product, and the specific test time shall be determined by both parties through negotiation.

4.Installation of measuring points, primary components and local instruments required for performance acceptance test shall be provided by the supplier and cooperated by the demander. The supplier shall also provide the technical cooperation and personnel cooperation required for the test.

5.Content of performance acceptance test

In accordance with supplier quality assurance and test requirements.

6.Criteria for performance acceptance test

In accordance with supplier's quality assurance and test requirements.

7.The performance acceptance test shall be conducted by the demander and participated by the supplier. The test program shall be provided by the demander and determined after discussion with the supplier. The specific test shall be completed by the testing department approved by both parties.

8.Confirmation of performance acceptance test results

The performance acceptance test report shall be prepared by the testing unit, and the conclusions of the report shall be accepted by both parties. If there is any disagreement between the two parties on the results of the test, the two parties shall settle it through negotiation. If no agreement can be reached, it shall be submitted to the superior departments of both parties for negotiation.

9.When a performance acceptance test is conducted, if a party fails to send personnel to participate in the test after receiving the test notice from the other party, it shall be deemed to have agreed to the acceptance test results.

Manufacture Supervision 

1.Supervise manufacturing basis

Refer to the former Ministry of power Industry, Ministry of Machinery Industry issued by the electricity Office (1995) No. 37 "Interim Provisions for the quality supervision of large power equipment", "General representative group working Regulations in large power equipment manufacturers"

2.Manufacturing supervision method

Document witness, on-site witness and shutdown pending inspection, namely R point,W point , and H point.

After each manufacturing supervision content is completed, the supplier and the manufacturing supervision representative will complete the signature procedures on the witness form. The supplier shall submit one copy to the demander's manufacturing supervision representative.

R point:The supplier only needs to provide items of inspection or test records or reports, that is, document evidence.

W point:Inspection or test items attended by the purchaser’s manufacturing supervision representative, i.e. on-site witness

H point: When the supplier stops to wait for the inspection or test of the buyer's supervision representative, that is, the project is stopped for inspection.

Upon receipt of the witness notice, the demander shall promptly send a representative to the site of the supplier's inspection or test to participate in on-site witness or stop work for inspection. If the representative of the demander cannot attend on time, point W can be automatically converted to point R, but if point H is not agreed to be converted to point R by written notice of the demander, the supplier will not transfer to the next process and agree with the demander to change the witness time. If the buyer is still unable to participate on time after the change, the H point will be automatically converted to R point.

3. Requirements for suppliers to cooperate with manufacturing supervision

3.1 The supplier has the obligation to cooperate with the demander's manufacturing supervision and provide relevant information in a timely manner without incurring any costs.

3.2 The Supplier shall provide the demander's supervision representative with the convenience of work and life

3.3 The supplier shall inform the Buyer's representative of the equipment supervision project and time before witnessing the site or stopping work for inspection..

3.4 Demander's supervision representative has the right to check (borrow) the technical information related to the contract supervision equipment. If demander considers it necessary to copy and file, the supplier shall provide convenience.

3.5 The supplier shall provide the inspection and test records and reports to the supervision representative of the demander after the witness.

    • Please fill in your name

    • Please provide your phone number

    • Please fill in your email address

    • Please fill in your country

    • Please fill in your requirement information

    • Submit information

    Hot Products

    Home WhatsApp Mail Inquiry